{"id":7532,"date":"2026-01-14T12:45:45","date_gmt":"2026-01-14T12:45:45","guid":{"rendered":"https:\/\/www.magna-industrial.es\/desarrollo\/proyectos\/sin-categoria\/centro-multinivel-goodman\/"},"modified":"2026-01-24T13:12:41","modified_gmt":"2026-01-24T13:12:41","slug":"centro-multinivel-goodman","status":"publish","type":"proyectos","link":"https:\/\/www.magna-industrial.es\/pt\/projetos\/edificacao-logistica\/centro-multinivel-goodman\/","title":{"rendered":"Centro Multin\u00edvel Goodman"},"content":{"rendered":"<p>Constru\u00e7\u00e3o de um centro log\u00edstico multin\u00edvel em Castellbisbal. O terreno tem 25.931 m\u00b2, com uma \u00e1rea bruta constru\u00edda de 26.405,19 m\u00b2 distribu\u00eddos por dois pisos. O espa\u00e7o de armaz\u00e9m \u00e9 de 12.474,56 m\u00b2 por piso, para al\u00e9m de 625,24 m\u00b2 de escrit\u00f3rios por inquilino, distribu\u00eddos por quatro pisos. Inclui ainda uma \u00e1rea de rece\u00e7\u00e3o no piso t\u00e9rreo com 176,40 m\u00b2.<\/p>\n<p>Al\u00e9m disso, disp\u00f5e de dois parques para cami\u00f5es adjacentes ao armaz\u00e9m, cada um com 15 pontos de carga e descarga, e um n\u00edvel interm\u00e9dio de 3.500 m\u00b2 para estacionamento de ve\u00edculos ligeiros.e veh\u00edculos ligeros.<\/p>\n","protected":false},"featured_media":7534,"template":"","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":""},"cat_proyectos":[657],"class_list":["post-7532","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry","cat_proyectos-edificacao-logistica"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/proyectos\/7532","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media\/7534"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media?parent=7532"}],"wp:term":[{"taxonomy":"cat_proyectos","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/cat_proyectos?post=7532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}