{"id":8830,"date":"2026-11-10T08:00:30","date_gmt":"2026-11-10T08:00:30","guid":{"rendered":"https:\/\/www.magna-industrial.es\/a-magna-arranca-com-as-obras-de-uma-plataforma-logistica-de-33-800-m%c2%b2-para-a-logicor-em-povoa-de-santa-iria-portugal\/"},"modified":"2026-11-10T08:03:44","modified_gmt":"2026-11-10T08:03:44","slug":"a-magna-arranca-com-as-obras-de-uma-plataforma-logistica-de-33-800-m%c2%b2-para-a-logicor-em-povoa-de-santa-iria-portugal","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/pt\/a-magna-arranca-com-as-obras-de-uma-plataforma-logistica-de-33-800-m%c2%b2-para-a-logicor-em-povoa-de-santa-iria-portugal\/","title":{"rendered":"A MAGNA arranca com as obras de uma plataforma log\u00edstica de 33.800 m\u00b2 para a Logicor em P\u00f3voa de Santa Iria (Portugal)"},"content":{"rendered":"<p>A MAGNA continua a sua expans\u00e3o no mercado portugu\u00eas e, desta vez, conta com a confian\u00e7a da <strong>Logicor<\/strong>, multinacional l\u00edder na propriedade, gest\u00e3o e desenvolvimento de ativos imobili\u00e1rios log\u00edsticos na Europa, para desenvolver uma <strong>plataforma log\u00edstica de nova gera\u00e7\u00e3o<\/strong> numa parcela de <strong>67.500 metros quadrados<\/strong> e com uma \u00e1rea constru\u00edda de <strong>33.800 metros quadrados<\/strong>.<\/p>\n<p>Este novo centro de distribui\u00e7\u00e3o foi concebido segundo os mais elevados padr\u00f5es de efici\u00eancia operacional, digitaliza\u00e7\u00e3o e sustentabilidade, prevendo-se que esteja plenamente operacional at\u00e9 setembro de 2027.<\/p>\n<p>Este novo centro de distribui\u00e7\u00e3o foi concebido segundo os mais elevados padr\u00f5es de efici\u00eancia operacional, digitaliza\u00e7\u00e3o e sustentabilidade, prevendo-se que esteja plenamente operacional at\u00e9 <strong>setembro de 2027<\/strong>.<\/p>\n<h4>Localiza\u00e7\u00e3o estrat\u00e9gica e sustentabilidade<\/h4>\n<p>A escolha de P\u00f3voa de Santa Iria responde \u00e0 sua excelente conectividade e adequa\u00e7\u00e3o geogr\u00e1fica, j\u00e1 consolidada como um polo de atra\u00e7\u00e3o para grandes plataformas de distribui\u00e7\u00e3o.<\/p>\n<p>Em linha com as pol\u00edticas ambientais atuais, a nova plataforma log\u00edstica contar\u00e1 com a certifica\u00e7\u00e3o de constru\u00e7\u00e3o sustent\u00e1vel <strong>BREEAM<\/strong>, <strong>n\u00edvel Excellent<\/strong>. O complexo incorporar\u00e1 sistemas de autoconsumo fotovoltaico, ilumina\u00e7\u00e3o LED inteligente, zonas verdes integradas e pontos de carregamento r\u00e1pido para frotas de ve\u00edculos el\u00e9tricos.<\/p>\n<p>Na parcela, os trabalhos de demoli\u00e7\u00e3o e movimenta\u00e7\u00e3o de terras j\u00e1 come\u00e7aram, marcando o in\u00edcio de um prazo de execu\u00e7\u00e3o estimado em 13 meses.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8823\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8824\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8825\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8826\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A MAGNA continua a sua expans\u00e3o no mercado portugu\u00eas e, desta vez, conta com a confian\u00e7a da Logicor, multinacional l\u00edder na propriedade, gest\u00e3o e desenvolvimento de ativos imobili\u00e1rios log\u00edsticos na Europa, para desenvolver uma plataforma log\u00edstica de nova gera\u00e7\u00e3o numa parcela de 67.500 metros quadrados e com uma \u00e1rea constru\u00edda de 33.800 metros quadrados. Este [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8831,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[658],"tags":[662,671],"class_list":["post-8830","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-edificacao-logistica","tag-magna","tag-plataforma-logistica"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts\/8830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/comments?post=8830"}],"version-history":[{"count":0,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts\/8830\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media\/8831"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media?parent=8830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/categories?post=8830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/tags?post=8830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}