{"id":8255,"date":"2026-02-10T08:44:50","date_gmt":"2026-02-10T08:44:50","guid":{"rendered":"https:\/\/www.magna-industrial.es\/magna-progresa-con-las-obras-de-la-plataforma-logistica-de-ultima-generacion-para-bgo-en-getafe\/"},"modified":"2026-02-10T17:32:46","modified_gmt":"2026-02-10T17:32:46","slug":"a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/","title":{"rendered":"A MAGNA est\u00e1 a avan\u00e7ar na constru\u00e7\u00e3o da plataforma log\u00edstica de \u00faltima gera\u00e7\u00e3o para a BGO em Getafe."},"content":{"rendered":"<p style=\"text-align: justify;\">Ap\u00f3s a nossa atualiza\u00e7\u00e3o anterior, a equipa t\u00e9cnica da MAGNA fez progressos significativos na execu\u00e7\u00e3o da plataforma log\u00edstica que estamos a desenvolver para a <strong>BGO<\/strong> em Getafe (Madrid).<\/p>\n<p style=\"text-align: justify;\">Este empreendimento, integralmente executado pela <strong>MAGNA<\/strong> e promovido pela <strong>HISPAVIMA<\/strong>, envolve a constru\u00e7\u00e3o completa de dois ativos log\u00edsticos essenciais para o operador <strong>XPO Logistics<\/strong>: um centro de distribui\u00e7\u00e3o cross-docking de \u00faltima milha com 15.000 m\u00b2 e um armaz\u00e9m log\u00edstico constru\u00eddo \u00e0 medida (BTS) com 9.000 m\u00b2.<\/p>\n<h1>Estado do Projeto<\/h1>\n<p style=\"text-align: justify;\">O projeto est\u00e1 a progredir de acordo com o cronograma e sob rigorosos crit\u00e9rios de qualidade e sustentabilidade, visando a obten\u00e7\u00e3o da certifica\u00e7\u00e3o ambiental <strong>BREEAM<\/strong>. Excelente. A gest\u00e3o do projeto est\u00e1 a cargo da SAVILLS, com monitoriza\u00e7\u00e3o da DOKEI RE.<\/p>\n<h2>Marcos conclu\u00eddos:<\/h2>\n<p><strong>Terraplenagem.<\/strong><br \/>\n<strong>Funda\u00e7\u00e3o.<\/strong><br \/>\n<strong>Estrutura<\/strong> do <strong>cross-dock<\/strong> e do <strong>armaz\u00e9m log\u00edstico<\/strong>.<br \/>\n<strong>Telhado<\/strong> do <strong>cross-dock<\/strong>.<\/p>\n<h2>Obras em curso:<\/h2>\n<p><strong>Infraestruturas e terreno:<\/strong> Estabiliza\u00e7\u00e3o do solo e espalhamento da sub-base, juntamente com a instala\u00e7\u00e3o de vigas anti-rolamento no armaz\u00e9m log\u00edstico.<br \/>\n<strong>Envolventes e fachadas:<\/strong> Progresso na fachada do armaz\u00e9m log\u00edstico e instala\u00e7\u00e3o de policarbonato na fachada norte do cross-dock.<br \/>\n<strong>Telhado do armaz\u00e9m log\u00edstico:<\/strong> Montagem de vigas e madres para concluir a parte superior do segundo edif\u00edcio.<br \/>\n<strong>Instala\u00e7\u00f5es T\u00e9cnicas:<\/strong> No armaz\u00e9m cross-dock est\u00e3o em curso trabalhos intensivos nas instala\u00e7\u00f5es el\u00e9tricas, sistemas de prote\u00e7\u00e3o contra inc\u00eandio e redes nas \u00e1reas de escrit\u00f3rio. Est\u00e3o tamb\u00e9m a ser instaladas calhas para drenagem de \u00e1guas pluviais.<br \/>\n<strong>Paisagismo:<\/strong> Est\u00e3o a ser abertas valas para a rede de drenagem de \u00e1guas pluviais em redor do armaz\u00e9m cross-dock.<\/p>\n<p>Com a conclus\u00e3o desta plataforma, a MAGNA reafirma a sua posi\u00e7\u00e3o como parceiro estrat\u00e9gico no desenvolvimento de ativos log\u00edsticos sustent\u00e1veis \u200b\u200be de \u00faltima gera\u00e7\u00e3o, tanto em Espanha como em Portugal.<\/p>\n<p>Imagens atuais da constru\u00e7\u00e3o.<\/p>\n\n<div uk-grid class=\"uk-child-width-1-4\">\n\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-10\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-9-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-8\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-7\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-6\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-5\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-4\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-3\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/pt\/a-magna-esta-a-avancar-na-construcao-da-plataforma-logistica-de-ultima-geracao-para-a-bgo-em-getafe\/avance-obras-magna-nave-bgo-getafe-1\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n    \n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Ap\u00f3s a nossa atualiza\u00e7\u00e3o anterior, a equipa t\u00e9cnica da MAGNA fez progressos significativos na execu\u00e7\u00e3o da plataforma log\u00edstica que estamos a desenvolver para a BGO em Getafe (Madrid). Este empreendimento, integralmente executado pela MAGNA e promovido pela HISPAVIMA, envolve a constru\u00e7\u00e3o completa de dois ativos log\u00edsticos essenciais para o operador XPO Logistics: um centro de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8257,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","footnotes":""},"categories":[658],"tags":[],"class_list":["post-8255","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-edificacao-logistica"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts\/8255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/comments?post=8255"}],"version-history":[{"count":6,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts\/8255\/revisions"}],"predecessor-version":[{"id":8285,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/posts\/8255\/revisions\/8285"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media\/8257"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/media?parent=8255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/categories?post=8255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/pt\/wp-json\/wp\/v2\/tags?post=8255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}