{"id":8828,"date":"2026-11-10T08:00:30","date_gmt":"2026-11-10T08:00:30","guid":{"rendered":"https:\/\/www.magna-industrial.es\/magna-breaks-ground-on-a-33800-m%c2%b2-logistics-platform-for-logicor-in-povoa-de-santa-iria-portugal\/"},"modified":"2026-11-10T08:03:38","modified_gmt":"2026-11-10T08:03:38","slug":"magna-breaks-ground-on-a-33800-m%c2%b2-logistics-platform-for-logicor-in-povoa-de-santa-iria-portugal","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/en\/magna-breaks-ground-on-a-33800-m%c2%b2-logistics-platform-for-logicor-in-povoa-de-santa-iria-portugal\/","title":{"rendered":"MAGNA breaks ground on a 33,800 m\u00b2 logistics platform for Logicor in P\u00f3voa de Santa Iria (Portugal)"},"content":{"rendered":"<p>MAGNA continues its expansion in the Portuguese market, this time earning the trust of <strong>Logicor<\/strong>, a leading multinational in the ownership, management, and development of logistics real estate assets in Europe, to develop a <strong>next-generation logistics platform<\/strong> on a <strong>67,500-square-meter<\/strong> plot with a built area of <strong>33,800 square meters<\/strong>.<\/p>\n<p>This new distribution center has been designed to the highest standards of operational efficiency, digitalization, and sustainability, and is expected to be fully operational by September 2027.<\/p>\n<p>This new distribution center has been designed to the highest standards of operational efficiency, digitalization, and sustainability, and is expected to be fully operational by <strong>September 2027<\/strong>.<\/p>\n<h4>Strategic location and sustainability<\/h4>\n<p>The selection of P\u00f3voa de Santa Iria reflects its excellent connectivity and prime geographic location, already established as a major hub for large distribution platforms.<\/p>\n<p>In line with current environmental policies, the new logistics platform will hold the sustainable building certification <strong>BREEAM<\/strong>, <strong>Excellent level<\/strong>. The complex will feature photovoltaic self-consumption systems, smart LED lighting, integrated green spaces, and fast-charging points for electric vehicle fleets.<\/p>\n<p>On site, demolition and earthworks have already begun, marking the start of an estimated 13-month construction period.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8823\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-1.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8824\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-2.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8825\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-3.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-300x213.jpg\" alt=\"\" width=\"300\" height=\"213\" class=\"alignnone size-medium wp-image-8826\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-300x213.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-1024x726.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4-768x545.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/MAGNA-inicio-obras-Povoa-4.jpg 1400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MAGNA continues its expansion in the Portuguese market, this time earning the trust of Logicor, a leading multinational in the ownership, management, and development of logistics real estate assets in Europe, to develop a next-generation logistics platform on a 67,500-square-meter plot with a built area of 33,800 square meters. This new distribution center has been [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8829,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[537],"tags":[541,559],"class_list":["post-8828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics-building","tag-magna","tag-plataforma-logistica"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/comments?post=8828"}],"version-history":[{"count":0,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8828\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media\/8829"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media?parent=8828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/categories?post=8828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/tags?post=8828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}