{"id":8580,"date":"2026-03-02T08:19:15","date_gmt":"2026-03-02T08:19:15","guid":{"rendered":"https:\/\/www.magna-industrial.es\/magna-accelerates-construction-of-malveira-prime-logistics-ensuring-compliance-with-deadlines\/"},"modified":"2026-07-01T10:27:48","modified_gmt":"2026-07-01T10:27:48","slug":"magna-accelerates-construction-of-malveira-prime-logistics-ensuring-compliance-with-deadlines","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/en\/magna-accelerates-construction-of-malveira-prime-logistics-ensuring-compliance-with-deadlines\/","title":{"rendered":"MAGNA accelerates construction of Malveira Prime Logistics, ensuring compliance with deadlines"},"content":{"rendered":"\n<p>El proyecto <strong>Malveira Prime Logistics<\/strong>, ejecutado \u00edntegramente por MAGNA con el respaldo de <strong>Blackstone<\/strong> y <strong>M7 Real Estate<\/strong>, contin\u00faa avanzando a paso firme en el municipio de Mafra. Con una superficie total de <strong>68.000 m\u00b2<\/strong>, en dos naves de 55 000 m\u00b2 y 13 000 m\u00b2, esta plataforma log\u00edstica va tomando forma con el avance de las obras que la convertir\u00e1n en un referente estrat\u00e9gico a solo 20 minutos de Lisboa.<\/p>\n\n\n\n<h2>Estado actual de las obras<\/h2>\n\n\n\n<p>Sobre las naves, nuestro equipo de obra ha ejecutado progresos decisivos, asegurando el <strong>cumplimiento de los plazos de entrega previstos<\/strong> para mayo y octubre de 2026:<\/p>\n\n\n\n<ul>\n<li><strong>Nave 2 (13.000 m\u00b2):<\/strong> <\/li>\n<li><strong>Cubierta:<\/strong> Se estima la conclusi\u00f3n total del montaje de la cubierta en las pr\u00f3ximas 3 semanas, lo que permitir\u00e1 iniciar pronto los trabajos en interiores protegidos de la intemperie.<\/li>\n<li><strong>Cerramientos y oficinas:<\/strong> Han finalizado los trabajos de carpinter\u00eda de aluminio en el \u00e1rea de oficinas.\n<li><strong>Instalaciones:<\/strong> Las instalaciones interiores ya muestran un avance significativo, optimizando los tiempos de cara a la fase de acabados.<\/li>\n<\/ul>\n<ul>\n<li><strong>Nave 1 (55.000 m\u00b2): <\/strong><\/li>\n<li><strong>Cimentaciones:<\/strong> Tras intensos trabajos de mejora del suelo, la conclusi\u00f3n de las fundaciones se prev\u00e9 para las pr\u00f3ximas 2 semanas.<\/li>\n<li><strong>Estructura:<\/strong> Se ha iniciado con fuerza el montaje de los elementos prefabricados, lo que permitir\u00e1 que el volumen de la nave principal comience a ser visible de forma inminente.<\/li>\n<\/ul>\n\n\n\n<h2>Compromiso con la excelencia y la sostenibilidad<\/h2>\n\n\n\n<p>Este avance constructivo se desarrolla bajo los estrictos par\u00e1metros que nos marca la certificaci\u00f3n <strong>BREEAM\u00ae Excelente.<\/strong> La gesti\u00f3n eficiente de los tiempos y materiales en esta fase de montaje refuerza el objetivo de MAGNA de entregar una infraestructura que no solo destaca por su excepcional ubicaci\u00f3n, sino por su <strong>m\u00ednimo impacto ambiental y m\u00e1xima eficiencia operativa.<\/strong><\/p>\n\n\n\n<p>Este proyecto nos llena de satisfacci\u00f3n y consolida nuestro plan de crecimiento en Portugal, demostrando capacidad t\u00e9cnica y agilidad en la ejecuci\u00f3n de proyectos log\u00edsticos de gran envergadura.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"8331\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1024x682.jpg\" alt=\"\" class=\"wp-image-8331\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1024x682.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-300x200.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-768x512.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna.jpg 1120w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"8330\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1-1024x682.jpg\" alt=\"\" class=\"wp-image-8330\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1-1024x682.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1-300x200.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1-768x512.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-1.jpg 1120w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"8329\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-4-1024x682.jpg\" alt=\"\" class=\"wp-image-8329\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-4-1024x682.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-4-300x200.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-4-768x512.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-4.jpg 1120w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"8328\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-2-1024x682.jpg\" alt=\"\" class=\"wp-image-8328\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-2-1024x682.jpg 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-2-300x200.jpg 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-2-768x512.jpg 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/malveira-prime-logistics-magna-2.jpg 1120w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>El proyecto Malveira Prime Logistics, ejecutado \u00edntegramente por MAGNA con el respaldo de Blackstone y M7 Real Estate, contin\u00faa avanzando a paso firme en el municipio de Mafra. Con una superficie total de 68.000 m\u00b2, en dos naves de 55 000 m\u00b2 y 13 000 m\u00b2, esta plataforma log\u00edstica va tomando forma con el avance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8581,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","footnotes":""},"categories":[537],"tags":[539,541,544,593],"class_list":["post-8580","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics-building","tag-edificacion-logistica","tag-magna","tag-nave-logistica","tag-malveira-prime-logistic"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/comments?post=8580"}],"version-history":[{"count":1,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8580\/revisions"}],"predecessor-version":[{"id":8582,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8580\/revisions\/8582"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media\/8581"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media?parent=8580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/categories?post=8580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/tags?post=8580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}