{"id":8252,"date":"2026-02-10T08:44:50","date_gmt":"2026-02-10T08:44:50","guid":{"rendered":"https:\/\/www.magna-industrial.es\/magna-progresa-con-las-obras-de-la-plataforma-logistica-de-ultima-generacion-para-bgo-en-getafe\/"},"modified":"2026-02-10T17:17:04","modified_gmt":"2026-02-10T17:17:04","slug":"magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/","title":{"rendered":"MAGNA is making progress with the construction of the state-of-the-art logistics platform for BGO in Getafe"},"content":{"rendered":"<p style=\"text-align: justify;\">Following our previous update, the MAGNA technical team has made significant progress in the execution of the logistics platform we are developing for <strong>BGO<\/strong> in Getafe (Madrid).<\/p>\n<p style=\"text-align: justify;\">This development, executed entirely by <strong>MAGNA<\/strong> and promoted by <strong>HISPAVIMA<\/strong>, involves the complete construction of two key logistics assets for the operator <strong>XPO Logistics<\/strong>: a 15,000 m\u00b2 last-mile cross-dock center and a 9,000 m\u00b2 built-to-suit (BTS) logistics warehouse.<\/p>\n<h1>Project Status<\/h1>\n<p style=\"text-align: justify;\">The project is progressing according to schedule and under strict quality and sustainability criteria, aiming to obtain <strong>BREEAM Excellent<\/strong> environmental certification. The project management is being handled by <strong>SAVILLS<\/strong>, with monitoring by <strong>DOKEI RE<\/strong>.<\/p>\n<h2>Milestones completed:<\/h2>\n<p><strong>Earthworks.<\/strong><br \/>\n<strong>Foundation.<\/strong><br \/>\n<strong>Structure<\/strong> of both the <strong>cross-dock<\/strong> and the <strong>logistics warehouse<\/strong>.<br \/>\n<strong>Roof<\/strong> of the <strong>cross-dock warehouse<\/strong>.<\/p>\n<h2>Works in progress:<\/h2>\n<p style=\"text-align: justify;\"><strong>Infrastructure and ground<\/strong>: Ground stabilization work and spreading of subbase, along with the installation of anti-roll beams in the logistics warehouse.<\/p>\n<p><strong>Envelopes and facades<\/strong>: Progress on the facade of the logistics warehouse and installation of polycarbonate on the north facade of the cross-dock warehouse.<\/p>\n<p><strong>Logistics roof<\/strong>: Assembly of beams and purlins to complete the upper part of the second asset.<\/p>\n<p><strong>Technical Installations:<\/strong> In the cross-dock warehouse, intensive work is underway on the electrical installations, fire protection systems, and networks in the office areas. Downpipes for water drainage are also being installed.<\/p>\n<p><strong>Landscaping:<\/strong> Trenches are being dug for the stormwater drainage network around the cross-dock warehouse.<\/p>\n<p>With the completion of this platform, MAGNA reaffirms its position as a strategic partner in the development of state-of-the-art, sustainable logistics assets in both Spain and Portugal.<\/p>\n<p>Current images of the construction.<\/p>\n\n<div uk-grid class=\"uk-child-width-1-4\">\n\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-10\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-10.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-9-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-9.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-8\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-8.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-7\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-7.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-6\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-6.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-5\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-5.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-4\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-4.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-3\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-3.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-2.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n            <div class='uk-text-center'>\n\n            \n            <a href='https:\/\/www.magna-industrial.es\/en\/magna-is-making-progress-with-the-construction-of-the-state-of-the-art-logistics-platform-for-bgo-in-getafe\/avance-obras-magna-nave-bgo-getafe-1\/'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-300x200.png\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Avance-Obras-MAGNA-Nave-BGO-Getafe-1.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n            \n        <\/div>\n    \n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Following our previous update, the MAGNA technical team has made significant progress in the execution of the logistics platform we are developing for BGO in Getafe (Madrid). This development, executed entirely by MAGNA and promoted by HISPAVIMA, involves the complete construction of two key logistics assets for the operator XPO Logistics: a 15,000 m\u00b2 last-mile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","footnotes":""},"categories":[537],"tags":[],"class_list":["post-8252","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics-building"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/comments?post=8252"}],"version-history":[{"count":7,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8252\/revisions"}],"predecessor-version":[{"id":8275,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/8252\/revisions\/8275"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media\/8254"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media?parent=8252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/categories?post=8252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/tags?post=8252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}