{"id":7320,"date":"2025-12-03T10:52:41","date_gmt":"2025-12-03T10:52:41","guid":{"rendered":"https:\/\/www.magna-industrial.es\/desarrollo\/avanzamos-con-las-obras-de-malveira-prime-logistics-donde-obtendremos-la-certificacion-breeam-excelente\/"},"modified":"2026-01-22T15:22:38","modified_gmt":"2026-01-22T15:22:38","slug":"we-are-making-progress-with-the-malveira-prime-logistics-project-where-we-will-obtain-breeam-excellent-certification","status":"publish","type":"post","link":"https:\/\/www.magna-industrial.es\/en\/we-are-making-progress-with-the-malveira-prime-logistics-project-where-we-will-obtain-breeam-excellent-certification\/","title":{"rendered":"We are making progress with the Malveira Prime Logistics project, where we will obtain BREEAM\u00ae Excellent certification."},"content":{"rendered":"\r\n<p style=\"text-align:justify;\">The <b>Malveira Prime Logistics<\/b> project, which <b>MAGNA<\/b> is fully executing and which is backed by <b>Blackstone<\/b> and <b>M7 Real Estate<\/b>, continues to consolidate its position as one of the most important logistics platforms near Lisbon. With a total built area of \u200b\u200b68,000 m\u00b2, in two warehouses of 55,000 m\u00b2 and 13,000 m\u00b2, the project is strategically located in the municipality of Mafra (Malveira), just 20 minutes from Lisbon, offering key connectivity via the A21, A8, and A9 motorways.\r\n\r\nMalveira Prime Logistics is designed to meet the most demanding requirements of the Portuguese logistics sector, and completion is scheduled for May 2026 (Warehouse 1) and October 2026 (Warehouse 2).\r\n\r\nOne of the pillars of the project is its strong environmental commitment, confirmed by the prestigious certification. <b>BREEAM\u00ae Excellent<\/b>. This distinction ensures that the platform has been designed to the strictest international standards, maximizing operational efficiency and guaranteeing an environmentally friendly and sustainable construction.\r\n\r\n\r\nThe MAGNA team reports significant progress in the construction of both buildings, with simultaneous work ensuring adherence to the planned schedule.\r\n\r\n\r\n\r\nIn Building 2, progress is focused on the roof structure and cladding: Phase 1 is already seeing remarkable progress in the roof assembly, while Phase 2 continues with the assembly of the prefabricated elements. &#8211;>\r\n\r\n\r\n<p style=\"text-align:justify;\">Meanwhile, work on <b>Hall 1<\/b> is focused on the foundation stages, with the <b>continued soil improvement<\/b> and the <b>development of the foundations.<\/b> In addition, <b>earthmoving<\/b> work and the <b>lining of the main slope, which is common to the project area, are ongoing.<\/b><\/p>\r\n\r\n\r\n\r\n<p style=\"text-align:justify;\">With this project, MAGNA reaffirms its leadership and growth plan in Portugal, strategically contributing to the development of advanced and sustainable logistics infrastructure.<\/p>\r\n\r\n\r\n\r\n<p style=\"text-align:justify;\">Current images of the progress of the works.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\r\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"6264\" src=\"https:\/\/www.magna-industrial.es\/desarrollo\/wp-content\/uploads\/\/Malveira-Prime-Logistics-MAGNA-1-1024x683.png\" alt=\"Malveira Prime Logistics MAGNA (1)\" class=\"wp-image-6264\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-1-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-1-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-1-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-1.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"6263\" src=\"https:\/\/www.magna-industrial.es\/desarrollo\/wp-content\/uploads\/\/Malveira-Prime-Logistics-MAGNA-2-1024x683.png\" alt=\"Malveira Prime Logistics MAGNA (2)\" class=\"wp-image-6263\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-2-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-2-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-2-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-2.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"6262\" src=\"https:\/\/www.magna-industrial.es\/desarrollo\/wp-content\/uploads\/\/Malveira-Prime-Logistics-MAGNA-3-1024x683.png\" alt=\"Malveira Prime Logistics MAGNA (3)\" class=\"wp-image-6262\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-3-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-3-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-3-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-3.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"6261\" src=\"https:\/\/www.magna-industrial.es\/desarrollo\/wp-content\/uploads\/\/Malveira-Prime-Logistics-MAGNA-4-1024x683.png\" alt=\"Malveira Prime Logistics MAGNA (4)\" class=\"wp-image-6261\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-4-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-4-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-4-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-4.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"6260\" src=\"https:\/\/www.magna-industrial.es\/desarrollo\/wp-content\/uploads\/\/Malveira-Prime-Logistics-MAGNA-5-1024x683.png\" alt=\"Malveira Prime Logistics MAGNA (5)\" class=\"wp-image-6260\" srcset=\"https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-5-1024x683.png 1024w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-5-300x200.png 300w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-5-768x512.png 768w, https:\/\/www.magna-industrial.es\/wp-content\/uploads\/Malveira-Prime-Logistics-MAGNA-5.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\r\n<\/figure>\r\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":7322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","footnotes":""},"categories":[537],"tags":[538,539,540,541,542,543,544,545],"class_list":["post-7320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics-building","tag-blackstone","tag-edificacion-logistica","tag-edificio-logistico","tag-magna","tag-malveira","tag-malveira-prime-logistics","tag-nave-logistica","tag-nave-logistica-portugal"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/7320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/comments?post=7320"}],"version-history":[{"count":4,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/7320\/revisions"}],"predecessor-version":[{"id":7411,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/posts\/7320\/revisions\/7411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media\/7322"}],"wp:attachment":[{"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/media?parent=7320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/categories?post=7320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.magna-industrial.es\/en\/wp-json\/wp\/v2\/tags?post=7320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}